Plan Room

Let’s get to it.

  • Carnegie Library of Pittsburgh - Library of the Blind & Physically Handicapped (PBPH) - Phase 2 Renovations

    Due: 12.09.2020 at 03:00 PM
    Location: Pittsburgh, PA

    Notes: The renovation of the entire 10,684 SF first floor suite in a three (3) story building, including a 1st floor exterior storefront and canopy and extension of the interior stairs to the 3rd floor. Prevailing wages apply.

    Downloads:

  • Ohio Hills Health Services- Covid-19 Testing Center Area Renovations

    Due: 12.16.2020 at 10:00 AM
    Location: Barnesville, OH

    Notes: Prevailing Wages apply.

    Downloads:

  • PA Trolley Museum-East Campus Welcome & Education Center

    Due: 11.12.2020 at 04:00 PM
    Location: Washington, PA

    Notes: Prevailing Wages apply.

    Downloads:

  • YMCA Hazelwood

    Due: 10.09.2020 at 04:00 PM
    Location: Pittsburgh, PA

    Notes: Interior and Exterior Improvements to an existing 7,080 sf 1 story building. Fit out of existing YMCA and daycare as K-12 school for 100 students. New accessible bathrooms, and minor renovations.

    Downloads:

  • State of West Virginia- WV Army National Guard- Construction & Facilities Management Office- Camp Dawson Building 215 Door and Window Renovations

    Due: 09.03.2020 at 03:23 PM
    Location: Kingwood, West Virginia

    Notes: Davis Bacon Wage Rates Apply. Waller Job # 861

    Downloads:

  • Allegheny County Airport Authority - 1st Floor Interior Renovation, Phase 3

    Due: 07.29.2020 at 01:00 PM
    Location: West Mifflin, PA

    Notes: Prevailing Wages apply.

    Downloads:

  • Ohio County Schools- Triadelphia Middle School- Additions and Renovations

    Due: 04.14.2020 at 01:30 PM
    Location: Wheeling, West Virginia

    Notes: Bid Package includes site improvements, building demolition. additions, general renovations, roof replacements, mechanical renovations, electrical renovations, and other Work indicated in the Bidding Documents.

    Downloads:

  • PENNDOT- Greene County Maintenance Office Construction- General Construction

    Due: 01.16.2020 at 11:00 AM
    Location: Waynesburg, PA

    Notes: Prevailing Wages Apply. Job 850

    Downloads:

  • Steward Healthcare Sharon Regional Medical Center Emergency Department Finishes Upgrade

    Due: 11.01.2019 at 05:00 PM
    Location: Sharon, PA

    Downloads:

  • Steward Healthcare Trumbull Medical Center Pharmacy

    Due: 10.16.2019 at 05:00 PM
    Location: Warren, OH

    Downloads:

  • Steward Healthcare Hillside Rehabilitation Pharmacy

    Due: 10.16.2019 at 04:00 AM
    Location: Warren, OH

    Notes: This project is Union

    Downloads:

  • UPMC Eye and Ear Institute- 6th and 7th Floor Renovation

    Due: 10.11.2019 at 02:00 PM
    Location: Pittsburgh, PA 15213

    Notes: Contact office for bid documents.

  • Centerville Clinics- Connellsville Medical & Dental Office

    Due: 10.11.2019 at 02:00 PM
    Location: Connellsville, PA

    Notes: Job 849 General construction renovations of an existing single story, 4,648 sf, on-grade building being renovated as a medical and dental office. The building is comprised of exterior masonry walls with a wood and metal framed roof system. The renovations will include, but not be limited to new exterior wall assemblies and finishes, new finished roofing membrane and associated roofing items, new exterior doors and windows, interior walls, finishes, casework, lighting, mechanical and plumbing, HVAC and electrical systems.

    Downloads:

  • North Strabane Township Fire Department SubStation

    Due: 09.13.2019 at 11:00 AM
    Location: North Strabane Township, Washington County, Pennsylvania Waller Job 837

    Notes: Project consists of a new two-story fire station. Work will include but not limited to: site grading and excavation, asphalt paving, masonry walls, steel roof and floor structure, concrete slabs on grade/deck, exterior metal wall panels, membrane roof system, interior finishes, rooftop mechanical equipment, all related to plumbing, mechanical, electrical, fire protection, technology systems, and site utility work.

    Downloads: